PE Interview: 2 Interviewers Dalam Satu Sesi
(Gambar diambil dari http://abovethelaw.com )
Assalamuálaikum dan Salam Sejahtera,
Sebelum ni aku cube cari kat mane-mane website atau blog contoh soalan interviewer tanye mane sesi interview PE. Tapi memang tak jumpe la. Jadi, aku bulldoze je la pergi interview dan bersedia la dengan segala kemungkinan soalan. Alhamdulillah aku pass. Tapi aku taknak la engineer lain termangu-mangu dan tak ready dengan soalan-soalan derang. Maka hari ni aku kongsi soalan-soalan yang aku kene (dan terkene) ketika interview PE.
Notes: Ape aku citer ni bukan la exactly happened mase interview tu. Aku pun da lupe da ape derang tnye dan ape aku jawab. Aku share sini mungkin ada tokok tambah dan mungkin ade terkurang.
Interviewer: Tell me about yourself
Aku: I am Azizul Hawari. The youngest among my siblings. I have two brothers... etc.. (ini adalah sesi presentation. Ambil masa selama 15 minutes. Korang kene la citer pasal latar belakang diri, experience report, dan technical report yang korang nak bentangkan)
Interviewer: During your work as building site engineer, what were your duties? (interviewer tau aku penah jd building site engineer melalui experience report aku. Malah dalam presentation 15 minit mula2 tadi pun aku ada citer)
Aku: My duties are to ensure that the project can run smoothly from site level. I need to check the sufficiency of materials at site. I also need to ensure the safety of the workers, quality, planning, reporting, etc.
Interviewer: What is the challenge/problems that you encounter working as building site engineer?
(Soalan ni memang tricky, korang jangan cakap plak takde challenge. Nampak sangat korang menipu. Mane ade keje sebagai engineer takde challenge. Melainkan memang korang tak keje la kan? :-D )
Aku: I had a few challenges that I faced. One of them were the site area was prone to theft. Everyday I need to check all my materials and equipment are still in order. At one time, my Electrical Sub-cont reported to me that their cables had been cut and stole. So, I need to report the case to the nearest police station so at least we can claim for insurance. Other case like lightening protection cable been stolen. The thief tied the cable to his vehicle and drive away pulling all the cable from the ground up to the roof, even after we already hired a night guard. Another case I wish like to share here is we also lost out steel bar 12 mm diameter size around 4 tonnes. The steel bars will be used to construct our stair. Therefore, to ensure my project progress run smoothly, I proposed to our consultant to use steel bar size of 10 mm diameter (which was available at site at that time) with center to center closer than 12 mm diameter steel bar reinforcement. My proposal was accepted and the project progress run smoothly.
Interviewer: Okey, good, but what happened if your proposal to use 10 mm diameter and caused the stair collapse?
Aku: (aku senyum, sebab interviewer to buat lawak je sebenarnye). First of all, the stair is not collapse until now. (kali ni interviewer to lak senyum). But if the stair collapsed, the responsibility still fall under our consultant. Because our consultant who approved my proposal and proceed with construction. However, I believed that I already calculated the reinforcement area correctly.
(Interviewer sebenarnye nak access kite punye confident level dan kefahaman kita tentang tanggungjawab sebagai PE).
Interviewer: You state in your report that some of the starter bar 40mm size need to be bent because the positions are a little bit off. Why was that happened?
(Sebenarnye, memang aku letak isu ini di dalam report aku. Ini antara isu yang besar dan kejayaan aku berjaya selesaikan isu ini di site).
Aku: The positions are a little bit off because the surveyor that we hired gave us a wrong starter bars position.
Interviewer: So, you bent the stater bars. Who gave you the permission to bend them?
Aku: I had a few discussion with our consultant and proposed a few ways to do the mitigation. One of them was to planted a new starter bar with the help of Hilti. But that option was too expensive. So we resort to one of the options which was to bent the bar to the correct positions. Our consultant advised us to bend them not more than 100mm. Fortunately all the incorrect starter bars positions are shifted away less than 100mm.
Interviewer: Tell me about yourself
Aku: I am Azizul Hawari. The youngest among my siblings. I have two brothers... etc.. (ini adalah sesi presentation. Ambil masa selama 15 minutes. Korang kene la citer pasal latar belakang diri, experience report, dan technical report yang korang nak bentangkan)
Interviewer: During your work as building site engineer, what were your duties? (interviewer tau aku penah jd building site engineer melalui experience report aku. Malah dalam presentation 15 minit mula2 tadi pun aku ada citer)
Aku: My duties are to ensure that the project can run smoothly from site level. I need to check the sufficiency of materials at site. I also need to ensure the safety of the workers, quality, planning, reporting, etc.
Interviewer: What is the challenge/problems that you encounter working as building site engineer?
(Soalan ni memang tricky, korang jangan cakap plak takde challenge. Nampak sangat korang menipu. Mane ade keje sebagai engineer takde challenge. Melainkan memang korang tak keje la kan? :-D )
Aku: I had a few challenges that I faced. One of them were the site area was prone to theft. Everyday I need to check all my materials and equipment are still in order. At one time, my Electrical Sub-cont reported to me that their cables had been cut and stole. So, I need to report the case to the nearest police station so at least we can claim for insurance. Other case like lightening protection cable been stolen. The thief tied the cable to his vehicle and drive away pulling all the cable from the ground up to the roof, even after we already hired a night guard. Another case I wish like to share here is we also lost out steel bar 12 mm diameter size around 4 tonnes. The steel bars will be used to construct our stair. Therefore, to ensure my project progress run smoothly, I proposed to our consultant to use steel bar size of 10 mm diameter (which was available at site at that time) with center to center closer than 12 mm diameter steel bar reinforcement. My proposal was accepted and the project progress run smoothly.
Interviewer: Okey, good, but what happened if your proposal to use 10 mm diameter and caused the stair collapse?
Aku: (aku senyum, sebab interviewer to buat lawak je sebenarnye). First of all, the stair is not collapse until now. (kali ni interviewer to lak senyum). But if the stair collapsed, the responsibility still fall under our consultant. Because our consultant who approved my proposal and proceed with construction. However, I believed that I already calculated the reinforcement area correctly.
(Interviewer sebenarnye nak access kite punye confident level dan kefahaman kita tentang tanggungjawab sebagai PE).
Interviewer: You state in your report that some of the starter bar 40mm size need to be bent because the positions are a little bit off. Why was that happened?
(Sebenarnye, memang aku letak isu ini di dalam report aku. Ini antara isu yang besar dan kejayaan aku berjaya selesaikan isu ini di site).
Aku: The positions are a little bit off because the surveyor that we hired gave us a wrong starter bars position.
Interviewer: So, you bent the stater bars. Who gave you the permission to bend them?
Aku: I had a few discussion with our consultant and proposed a few ways to do the mitigation. One of them was to planted a new starter bar with the help of Hilti. But that option was too expensive. So we resort to one of the options which was to bent the bar to the correct positions. Our consultant advised us to bend them not more than 100mm. Fortunately all the incorrect starter bars positions are shifted away less than 100mm.
Aku akan sambung lg dalam Part B nanti.